Servicing the Greater Twin Cities Area — Licensed, Bonded & Insured

EV CHARGER INSTALLATION.

Charge smarter at home. Hawkins Electric installs Level 2 EV chargers that cut charging time from overnight to just a few hours.

EV Charger Installation

A standard 120V outlet can take 40+ hours to fully charge an Electric Vehicle. A professionally installed Level 2 (240V) home charger gets you from empty to full in 4–8 hours — overnight, every night. We install all major charger brands, assess your panel capacity, and handle permits so your setup is safe, efficient, and code-compliant from day one.

EV adoption in Minnesota is growing fast, and so is the demand for reliable home charging. The standard approach — plugging into a regular 120V garage outlet — works in a pinch, but it's slow and often stresses a circuit that wasn't designed for continuous high-draw loads. A dedicated Level 2 (240V) charger circuit is the right solution for daily driving, and it pays for itself quickly in convenience alone.

The installation process starts with an assessment of your electrical panel. Many homes have enough available capacity to add a 50-amp EV circuit without any panel work. Others need a modest upgrade or a load management device to balance the draw. We give you an honest evaluation before quoting, so there are no surprises.

Hawkins Electric installs all major Level 2 charger brands — Tesla Wall Connector, ChargePoint, Emporia, Blink, and others. We handle both garage and outdoor installations, using weatherproof enclosures rated for Minnesota winters. We also pull the required permit and provide documentation for utility rebate programs, which can offset a portion of the installation cost.

If you're a customer of Xcel Energy, Connexus Energy, Dakota Electric, or Wright-Hennepin, it's worth asking your utility about their time-of-use rate programs. These utilities offer EV-specific plans that can significantly reduce your charging costs by shifting overnight charging to off-peak hours. A smart, Wi-Fi connected charger makes it easy to schedule charging automatically to take advantage of lower rates.

We serve EV owners throughout the Greater Twin Cities, including Blaine, Lino Lakes, Maple Grove, Plymouth, Minneapolis, Eden Prairie, Eagan, Woodbury, and the surrounding area. Book online or call to schedule your installation.

What We Do

EVERYTHING COVERED.

Level 2 (240V) Installation

The gold standard for home EV charging — fast, convenient, and installed correctly.

All Major Brands

We install Tesla Wall Connector, ChargePoint, Emporia, Blink, and more.

Panel Capacity Assessment

We check your panel's available capacity before installation and recommend upgrades if needed.

Garage & Outdoor Installs

Chargers installed inside your garage or outdoors with weatherproof NEMA enclosures.

Smart Charger Setup

Configure Wi-Fi connected chargers with scheduling, energy monitoring, and app control.

Multi-Vehicle Setups

Install multiple chargers or load-sharing systems to charge two vehicles from one circuit.

Permit Handling

We pull permits and pass inspection — required for many utility rebate programs.

Utility Rebates

We provide documentation needed for utility company EV charger rebates.

The Hawkins Standard

WHY CHOOSE HAWKINS ELECTRIC?

Licensed, bonded & insured
Permits pulled and inspections handled
Clean worksite — we respect your home
Local Twin Cities team, fast response
Quality workmanship on every project

Ready to get started?

Book online or call us. We'll walk you through the scope and price — no pressure, no surprises.

FAQ

COMMON QUESTIONS

What's the difference between Level 1 and Level 2 charging?

Level 1 uses a standard 120V outlet and adds about 4–5 miles of range per hour. Level 2 uses 240V and adds 20–30 miles per hour — making overnight charging a full charge for most EVs.

Do I need a panel upgrade to add an EV charger?

Not always. We assess your current panel load before quoting. Many homes have enough capacity; some need a small upgrade or load management device.

Can I install a charger in an unheated garage?

Yes — we use outdoor-rated chargers and run conduit that can handle Minnesota winters. We specify equipment rated for cold climates.

How long does installation take?

Most EV charger installs are completed in 2–4 hours for a straightforward setup. If panel work is needed, plan for a full day.

READY TO GET STARTED?

Book online or call us now. Serving the Greater Twin Cities area.